Planking completed

 

The planking is now completed. In a manner of speaking, the structural work on the hull is basically done. However, there is a lot of work still to be done before the fiberglass goes on.

I had just barely enough epoxy left to finish the job. I used System Three Silvertip, which I thickened with #2 silica, as the last of my mahogany sawdust was gone. I was also running low on 1” silicon bronze screws. However, I did have plenty of 1-1/4” screws. So, I snipped the ends off of enough of them to finish the job, and they worked just fine.

Now its time for a lot of sanding.

Related Posts by Categories

0 comments:

Post a Comment